today its sad news, my sentence has been extended. The insulation and drywall are going tomorrow which should mean I'm almost ready to hand this project over to the designer but yesterday the build sheet suddenly shows a requirement for a heated floor...wait what????.....that is not a small change and I don't see it taking less than 2 months. But its apparently my double my fault, 1st I put pipes in the shop then I brought lana to the basement to go-over details and she realized that even mid-summer it "cold" down there.
When I put the doors in I raised the threshold 1" because I guess in my heart I knew this day would come, I just didn't imagine it coming so soon. I was on to picking out a projector and realizing my plan to hide it neatly on the ceiling in front of a beam was an issue in that it was too close to get the 130" image but I had just found this guy:
https://www.bestbuy.com/site/optoma-uhd52alv-4k-uhd-smart-dlp-projector-with-high-dynamic-range-black/6379640.p?skuId=6379640and if I tuck it all the way back into the I section of the beam will give me 129", its bright enough for my a non-walled theater area, decent colors, and its got a fast enough fps rate to make the kids happy gaming, i could already see myself on the sofa with a drink....or in the race chair at least pretending I have a running race car.......now I see myself grinding the paint off the floor and mixing oh...about 180 bags of concrete.....