mk e wrote:
You know...I was thinking of upstairs as storage. Making it a functioning space is an excellent suggestion since it it basically the size of another bay....probably need to double sheet the floor though and drywall and insulate and hvac.
For hvac I was planning a 36k btu 4 zone minisplit system, 1 in the bathroom and 3 spread around the shop as 4x9k units. I think they have a 2x9 + 2x12 42k option or similar.
hmmmmmm..........
I see your point on keeping heavy stuff as out of the way as possible. The flow bench I mostly use as a work bench and I love having a bench next to the machines to layout tools and parts. I also like the have spme shelves for the collects, clamps ect.....space disappears fast.
I was thinking if you are going to put in permanent stairs to put lightweight things you use the least? If you use the flow bench for other things than by all means keep it where it is. I put a propane unit heater in mine, no AC...yet. I think I paid about $750 for a 75,000 btu unit heater and about another $50 for double walled "B" pipe to vent it out the roof